Blenheim Gilboa / 3
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 250 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-44a93a4ab5e5e913759d447c |
| Net Summer Capacity (MW) | 292.4 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-44a93a4ab5e5e913759d447c |
| Net Winter Capacity (MW) | 293 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-44a93a4ab5e5e913759d447c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 15296 |
| Entity Name | New York Power Authority |
| Plant ID | 2691 |
| Plant Name | Blenheim Gilboa |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NY |
| County | Schoharie |
| Balancing Authority Code | NYIS |
| Sector | Electric Utility |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 250 |
| Net Summer Capacity (MW) | 292.4 |
| Net Winter Capacity (MW) | 293 |
| Technology | Hydroelectric Pumped Storage |
| Energy Source Code | WAT |
| Prime Mover Code | PS |
| Operating Month | 7 |
| Operating Year | 1973 |
| Status | (OP) Operating |
| Latitude | 42.4423 |
| Longitude | -74.4479 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:4012 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4007
Sources EV-e2b1b14548494d02e9b1cfe7Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 48f148e0568fcf559e30fbbf86978f5df173cf35afc5f68ab9cc133c8b37da48
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4012
Sources EV-44a93a4ab5e5e913759d447cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c3cecd2f069bdb5e5191da854a730915091173d426bcedcab2a1b24f198c2d58
Usage terms US government public domain
