United States of America · Generator · plant location

Soft Maple / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Erie Boulevard Hydropower LP
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.9206, -75.2433

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Soft Maple / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c1c88fb4321b3f8fee92da59
Net Summer Capacity (MW)7.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c1c88fb4321b3f8fee92da59
Net Winter Capacity (MW)8.1 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-c1c88fb4321b3f8fee92da59
Detailed source fields
Original source fieldPublished value or condition
Entity ID5914
Entity NameErie Boulevard Hydropower LP
Plant ID2610
Plant NameSoft Maple
Google MapMap
Bing MapMap
Plant StateNY
CountyLewis
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator ID2
Nameplate Capacity (MW)8
Net Summer Capacity (MW)7.2
Net Winter Capacity (MW)8.1
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1925
Status(OP) Operating
Latitude43.9206
Longitude-75.2433
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3948

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3943

Sources EV-a7220185960ee851e4315c63
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 91a1ad2ee3269d651f9c1194ceebbf59fdbbdd29c01e360a97944b325b5a4c05

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3948

Sources EV-c1c88fb4321b3f8fee92da59
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 200cc5a103de3672431f6a224fe212ce60e85744c604e839dd28659079d25447

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel