United States of America · Generator · plant location

E C Gaston / 3

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Alabama Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
33.244211, -86.45806

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

E C Gaston / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)272 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0505bc80b9f12d00d88bde83
Net Summer Capacity (MW)254 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0505bc80b9f12d00d88bde83
Net Winter Capacity (MW)254 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0505bc80b9f12d00d88bde83
Detailed source fields
Original source fieldPublished value or condition
Entity ID195
Entity NameAlabama Power Co
Plant ID26
Plant NameE C Gaston
Google MapMap
Bing MapMap
Plant StateAL
CountyShelby
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)272
Net Summer Capacity (MW)254
Net Winter Capacity (MW)254
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month6
Operating Year1961
Status(OP) Operating
Latitude33.244211
Longitude-86.45806
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:75

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:74

Sources EV-8bd150306803ea123e634412
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 61b4ccbcf5e0a55289213dc956b4f0aa27d9132cc86813f930284751227f11cb

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:75

Sources EV-0505bc80b9f12d00d88bde83
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 16002a83e5bf5b00391e837b9124a76b98e05d1208182dc44db2788cc6a13f7a

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel