United States of America · Generator · plant location

Black River / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Erie Boulevard Hydropower LP
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.000122, -75.81315

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Black River / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-eb6ed4d083a5bc04bcc07914
Net Summer Capacity (MW)1.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-eb6ed4d083a5bc04bcc07914
Net Winter Capacity (MW)2.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-eb6ed4d083a5bc04bcc07914
Detailed source fields
Original source fieldPublished value or condition
Entity ID5914
Entity NameErie Boulevard Hydropower LP
Plant ID2546
Plant NameBlack River
Google MapMap
Bing MapMap
Plant StateNY
CountyJefferson
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)2
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)2.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1920
Status(OP) Operating
Latitude44.000122
Longitude-75.81315
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3824

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3819

Sources EV-217d723a0a0c68188a3a7a3b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d05a4cb19f26dda9f64be983a6764293caf42cd6d53c46613a5cab87ae171805

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3824

Sources EV-eb6ed4d083a5bc04bcc07914
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7a9e274ff49259ee66218fd89359313d73682f9cec10b255f12d19abbeb33b28

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel