United States of America · Generator · plant location

Belfort / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Erie Boulevard Hydropower LP
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.9275, -75.3331

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Belfort / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e72a4337166ef2f1b7cdbbde
Net Summer Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e72a4337166ef2f1b7cdbbde
Net Winter Capacity (MW)0.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e72a4337166ef2f1b7cdbbde
Detailed source fields
Original source fieldPublished value or condition
Entity ID5914
Entity NameErie Boulevard Hydropower LP
Plant ID2544
Plant NameBelfort
Google MapMap
Bing MapMap
Plant StateNY
CountyLewis
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator ID2
Nameplate Capacity (MW)0.6
Net Summer Capacity (MW)0.5
Net Winter Capacity (MW)0.5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1915
Status(OP) Operating
Latitude43.9275
Longitude-75.3331
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3818

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3813

Sources EV-43b2381cdc9af385fe4e84c7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f993dbf0dc8915a7348c4ff05317374f64d1422bb2b71d27f30582b69a7f62d5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3818

Sources EV-e72a4337166ef2f1b7cdbbde
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4e820b722c3765e6881db1eadd71659436ea49e82a5156886de09a280309ed74

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel