Bethlehem Energy Center / 6
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 194.3 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-a498e6cab071ba7b46cf0d47 |
| Net Summer Capacity (MW) | 169.1 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-a498e6cab071ba7b46cf0d47 |
| Net Winter Capacity (MW) | 203.7 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-a498e6cab071ba7b46cf0d47 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65417 |
| Entity Name | GB II New York LLC |
| Plant ID | 2539 |
| Plant Name | Bethlehem Energy Center |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NY |
| County | Albany |
| Balancing Authority Code | NYIS |
| Sector | IPP Non-CHP |
| Generator ID | 6 |
| Unit Code | CC1 |
| Nameplate Capacity (MW) | 194.3 |
| Net Summer Capacity (MW) | 169.1 |
| Net Winter Capacity (MW) | 203.7 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 7 |
| Operating Year | 2005 |
| Status | (OP) Operating |
| Latitude | 42.594196 |
| Longitude | -73.76375 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:3811 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3806
Sources EV-889c9ad09ac8499757870453Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ca01f165aee439080e2eb9c697186c252dabb65f5443f2276b5dfaf874a01fc3
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3811
Sources EV-a498e6cab071ba7b46cf0d47Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 119978d2f889dd5a4238c72a5836af4ca1736886effd5459542c4dce38916f3b
Usage terms US government public domain
