Bergen Generating Station / 1201
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 112.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-ca2c1bde3c50da40755e61bc |
| Net Summer Capacity (MW) | 110 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-ca2c1bde3c50da40755e61bc |
| Net Winter Capacity (MW) | 110 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-ca2c1bde3c50da40755e61bc |
| Planned Uprate of Summer Capacity (MW) | 10 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-ca2c1bde3c50da40755e61bc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67826 |
| Entity Name | Parkway Generation Operating, LLC |
| Plant ID | 2398 |
| Plant Name | Bergen Generating Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NJ |
| County | Bergen |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | 1201 |
| Unit Code | CC1 |
| Nameplate Capacity (MW) | 112.5 |
| Net Summer Capacity (MW) | 110 |
| Net Winter Capacity (MW) | 110 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 6 |
| Operating Year | 1995 |
| Status | (OP) Operating |
| Planned Uprate Year | 2026 |
| Planned Uprate Month | 11 |
| Planned Uprate of Summer Capacity (MW) | 10 |
| Latitude | 40.8375 |
| Longitude | -74.0244 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:3635 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3630
Sources EV-d01ee8315c2974017017574bEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e5ec467fb4daf08691cf4a1cca1d74d48a874f2e450dd57ba301662246483bb5
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3635
Sources EV-ca2c1bde3c50da40755e61bcEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1b81672a66f8bed4ebfd67ad675cc56fcc43804c217bc773b73803496446448a
Usage terms US government public domain
