United States of America · Generator · plant location

Reid Gardner / 3

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Nevada Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
36.657347, -114.6333

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Reid Gardner / 3

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)114 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-c54316f80ec690a6139e0b21
Net Summer Capacity (MW)98 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-c54316f80ec690a6139e0b21
Net Winter Capacity (MW)98 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-c54316f80ec690a6139e0b21
Detailed source fields
Original source fieldPublished value or condition
Entity ID13407
Entity NameNevada Power Co
Plant ID2324
Plant NameReid Gardner
Google MapMap
Bing MapMap
Plant StateNV
CountyClark
Balancing Authority CodeNEVP
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)114
Net Summer Capacity (MW)98
Net Winter Capacity (MW)98
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month5
Operating Year1976
Retirement Month12
Retirement Year2014
Latitude36.657347
Longitude-114.6333
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:3691

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1610

Sources EV-e76a8fcb7fdca180de53f486
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8b5d8bc88928aadb64d1470a950c62f15acf4de6ef8314517c6f477e6ebf7f2b

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:3691

Sources EV-c54316f80ec690a6139e0b21
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8e5c6ab03d28bebb34c179acd7c33d5fa06d475164cdfb933db8fd42f695a2b6

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel