Thompson Falls / TF4
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-6d108092b070ecc6bf43574d |
| Net Summer Capacity (MW) | 6.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-6d108092b070ecc6bf43574d |
| Net Winter Capacity (MW) | 6.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-6d108092b070ecc6bf43574d |
| Planned Uprate of Summer Capacity (MW) | 1.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-6d108092b070ecc6bf43574d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13902 |
| Entity Name | NorthWestern Energy (MT Hydro) |
| Plant ID | 2195 |
| Plant Name | Thompson Falls |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MT |
| County | Sanders |
| Balancing Authority Code | NWMT |
| Sector | Electric Utility |
| Generator ID | TF4 |
| Nameplate Capacity (MW) | 6 |
| Net Summer Capacity (MW) | 6.5 |
| Net Winter Capacity (MW) | 6.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 11 |
| Operating Year | 1916 |
| Status | (OP) Operating |
| Planned Uprate Year | 2031 |
| Planned Uprate Month | 12 |
| Planned Uprate of Summer Capacity (MW) | 1.5 |
| Latitude | 47.593155 |
| Longitude | -115.3582 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:3353 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:3347
Sources EV-db896e7dae2980506a495490Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5dd4f82f330934b17b47b4bdbff9948f3ca22a27871cb4671e098e1cb6797762
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:3353
Sources EV-6d108092b070ecc6bf43574dEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7c0d15914e7b7ae379b3466225ad4c9ac3f43e367b2415d291aba29d6ca061c0
Usage terms US government public domain