Hauser / HAU9
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 3.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d4504d85532fd41af5cd19d7 |
| Net Summer Capacity (MW) | 3.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d4504d85532fd41af5cd19d7 |
| Net Winter Capacity (MW) | 3.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d4504d85532fd41af5cd19d7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13902 |
| Entity Name | NorthWestern Energy (MT Hydro) |
| Plant ID | 2185 |
| Plant Name | Hauser |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MT |
| County | Lewis and Clark |
| Balancing Authority Code | NWMT |
| Sector | Electric Utility |
| Generator ID | HAU9 |
| Nameplate Capacity (MW) | 3.5 |
| Net Summer Capacity (MW) | 3.5 |
| Net Winter Capacity (MW) | 3.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 6 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 46.765941 |
| Longitude | -111.8873 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1534 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:46
Sources EV-2603d8c804aaa6ec2ba57845Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 31fa61112a79de7dd50ede820794bbd67689a07fb044e883a0ba3e626f65a299
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1534
Sources EV-d4504d85532fd41af5cd19d7Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 160e44c5b094a327390432500dbf5e8be45b673f1dafc6524c91e3ea4f23f185
Usage terms US government public domain
