Hauser / HAU12
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 3.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5af99a42b7e4ae278df5f26c |
| Net Summer Capacity (MW) | 3.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5af99a42b7e4ae278df5f26c |
| Net Winter Capacity (MW) | 3.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-5af99a42b7e4ae278df5f26c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13902 |
| Entity Name | NorthWestern Energy (MT Hydro) |
| Plant ID | 2185 |
| Plant Name | Hauser |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MT |
| County | Lewis and Clark |
| Balancing Authority Code | NWMT |
| Sector | Electric Utility |
| Generator ID | HAU12 |
| Nameplate Capacity (MW) | 3.5 |
| Net Summer Capacity (MW) | 3.5 |
| Net Winter Capacity (MW) | 3.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 12 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 46.765941 |
| Longitude | -111.8873 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1999 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:45
Sources EV-07d9632b23fb23be8a15dec0Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 51991b38dafb8151dc27d000d028c166368a836babbcd6df616dec9dbcd7e597
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1999
Sources EV-5af99a42b7e4ae278df5f26cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a5d20c77449d40639d1d660129886d75815884b69446b895b9de93a3d4f65a7b
Usage terms US government public domain
