Black Dog / 8
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-adea0672c10c8e986080fd43 |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-adea0672c10c8e986080fd43 |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-adea0672c10c8e986080fd43 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13781 |
| Entity Name | Northern States Power Co - Minnesota |
| Plant ID | 1904 |
| Plant Name | Black Dog |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Dakota |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 8 |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Latitude | 44.8108 |
| Longitude | -93.2501 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:38 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1353
Sources EV-73046b019ee9dca45b68574dEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8d6ffe785a5b0f202c7e9b7b2c37f01e5a77364e7c011a1547e091e0cb10fe35
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:38
Sources EV-adea0672c10c8e986080fd43Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8d18e455227b1fcace6d6d511c40811c01649ad0f02ec714c319d173f344cf38
Usage terms US government public domain
