United States of America · Generator · plant location

Black Dog / 6-1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Northern States Power Co - Minnesota
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.8108, -93.2501

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Black Dog / 6-1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)238 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-855b9af2987bea4434cbafdf
Net Summer Capacity (MW)209 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-855b9af2987bea4434cbafdf
Net Winter Capacity (MW)225 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-855b9af2987bea4434cbafdf
Detailed source fields
Original source fieldPublished value or condition
Entity ID13781
Entity NameNorthern States Power Co - Minnesota
Plant ID1904
Plant NameBlack Dog
Google MapMap
Bing MapMap
Plant StateMN
CountyDakota
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID6-1
Nameplate Capacity (MW)238
Net Summer Capacity (MW)209
Net Winter Capacity (MW)225
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month4
Operating Year2018
Planned Retirement Month12
Planned Retirement Year2058
Status(OP) Operating
Latitude44.8108
Longitude-93.2501
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:2906

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2899

Sources EV-979a8b089546e95bffe32169
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4dea80c873e18a33f2aa57f8c698139efa261d30ac093d6dee2c90200900a667

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2906

Sources EV-855b9af2987bea4434cbafdf
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 66514b591827b34877a13cfb80cae1676c2d570d44e049e710e9f3d00e91ce03

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel