Scanlon / 2
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 0.4 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-9b0c126ab22f28e421bb768d |
| Net Summer Capacity (MW) | 0.4 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-9b0c126ab22f28e421bb768d |
| Net Winter Capacity (MW) | 0.4 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-9b0c126ab22f28e421bb768d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 12647 |
| Entity Name | ALLETE, Inc. |
| Plant ID | 1899 |
| Plant Name | Scanlon |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Carlton |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 2 |
| Nameplate Capacity (MW) | 0.4 |
| Net Summer Capacity (MW) | 0.4 |
| Net Winter Capacity (MW) | 0.4 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 1 |
| Operating Year | 1923 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 46.709126 |
| Longitude | -92.42173 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:2890 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2883
Sources EV-1f8f38e155fab4c8d988de11Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5c57729e1a69f84fa79ddadb7eeb2d58b29e73adc7edd021bcbcd5041a09255b
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2890
Sources EV-9b0c126ab22f28e421bb768dEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 83ce8929c4b38c957050efeead853e525c2c602b89b42fbe0b443cd4b7301941
Usage terms US government public domain
