Pillager / 2
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 0.8 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-336ab647d4884c6a54ec76c7 |
| Net Summer Capacity (MW) | 0.8 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-336ab647d4884c6a54ec76c7 |
| Net Winter Capacity (MW) | 0.8 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-336ab647d4884c6a54ec76c7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 12647 |
| Entity Name | ALLETE, Inc. |
| Plant ID | 1898 |
| Plant Name | Pillager |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Cass |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 2 |
| Nameplate Capacity (MW) | 0.8 |
| Net Summer Capacity (MW) | 0.8 |
| Net Winter Capacity (MW) | 0.8 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 1 |
| Operating Year | 1917 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 46.316033 |
| Longitude | -94.48494 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:2888 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2881
Sources EV-02f1b15a2c2626519c294405Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c7697d0c18e780cd8f753be6ee58800e0240fe7200af80200fe66f5a62e7c37f
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2888
Sources EV-336ab647d4884c6a54ec76c7Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 26cb70f7bcc263700bab4c3789e90f0cd51ef036f370acc34ab6ef4e59812487
Usage terms US government public domain
