United States of America · Generator · plant location

Pillager / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
ALLETE, Inc.
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
46.316033, -94.48494

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Pillager / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-435227311b136bf2b8345bb6
Net Summer Capacity (MW)0.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-435227311b136bf2b8345bb6
Net Winter Capacity (MW)0.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-435227311b136bf2b8345bb6
Detailed source fields
Original source fieldPublished value or condition
Entity ID12647
Entity NameALLETE, Inc.
Plant ID1898
Plant NamePillager
Google MapMap
Bing MapMap
Plant StateMN
CountyCass
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.9
Net Winter Capacity (MW)0.9
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1917
Status(OP) Operating
Latitude46.316033
Longitude-94.48494
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:2887

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2880

Sources EV-81c09b40f03807943a1bc931
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6cef07dac2a2105975cca2efdc037f0c0b441efcbc092911188edd6e7fc1f828

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2887

Sources EV-435227311b136bf2b8345bb6
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b3247e8283b1df7e2dafdd9c6afb96cf38eb3e087023d201f11c5bac7303321c

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel