United States of America · Generator · plant location

Hillsdale / 7

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Hillsdale Board of Public Wks
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
41.9061, -84.6319

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Hillsdale / 7

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.6 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3ef507b9be8612f073be29d6
Net Summer Capacity (MW)1.5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3ef507b9be8612f073be29d6
Net Winter Capacity (MW)1.5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3ef507b9be8612f073be29d6
Detailed source fields
Original source fieldPublished value or condition
Entity ID8631
Entity NameHillsdale Board of Public Wks
Plant ID1829
Plant NameHillsdale
Google MapMap
Bing MapMap
Plant StateMI
CountyHillsdale
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID7
Nameplate Capacity (MW)1.6
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.5
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month6
Operating Year2008
Retirement Month7
Retirement Year2013
Latitude41.9061
Longitude-84.6319
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:4164

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1283

Sources EV-d90be2d9b8fdab03c8ea8673
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2bbcda1063482ef74485590d33b119c56955a880935c81c5fafda73af5d4ca95

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4164

Sources EV-3ef507b9be8612f073be29d6
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ef0249eac89816748f25daf4f5307d364e4cb8e610daabeb4f365ca48a178dd5

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel