United States of America · Generator · plant location

Berrien Springs / 8

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Indiana Michigan Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
41.9439, -86.3289

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Berrien Springs / 8

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b1a199e5390e06cbc48760b4
Net Summer Capacity (MW)0.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b1a199e5390e06cbc48760b4
Net Winter Capacity (MW)0.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-b1a199e5390e06cbc48760b4
Detailed source fields
Original source fieldPublished value or condition
Entity ID9324
Entity NameIndiana Michigan Power Co
Plant ID1753
Plant NameBerrien Springs
Google MapMap
Bing MapMap
Plant StateMI
CountyBerrien
Balancing Authority CodePJM
SectorElectric Utility
Generator ID8
Nameplate Capacity (MW)0.6
Net Summer Capacity (MW)0.4
Net Winter Capacity (MW)0.2
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month11
Operating Year1996
Status(OP) Operating
Latitude41.9439
Longitude-86.3289
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:2730

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2721

Sources EV-0d208a76dfed188d70e1516b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8182a15a482ac1a9baf10334061569789ec5c73744667981a669c15cc8ecb343

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2730

Sources EV-b1a199e5390e06cbc48760b4
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 96d382c4ea017f417552d54bce5ef46452b4baeed028293c357013ce8ca796eb

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel