United States of America · Generator · plant location

Placid 12 / 5

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
DTE Electric Company
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.7106, -83.4569

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Placid 12 / 5

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2ec9294032f6a41ef2cb8bd0
Net Summer Capacity (MW)3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2ec9294032f6a41ef2cb8bd0
Net Winter Capacity (MW)3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2ec9294032f6a41ef2cb8bd0
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1737
Plant NamePlacid 12
Google MapMap
Bing MapMap
Plant StateMI
CountyOakland
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)2.7
Net Summer Capacity (MW)3
Net Winter Capacity (MW)3
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month11
Operating Year1970
Status(OP) Operating
Latitude42.7106
Longitude-83.4569
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:2629

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2620

Sources EV-863278e99a80f7612d006e37
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d0b4d96c1e8b6869f87d833dacfc42708b3f8692b8e9526d42f8564decb0004d

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2629

Sources EV-2ec9294032f6a41ef2cb8bd0
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e4a63382b95ac3204c93e6f86d3096e445e32643ef3c55770bde355797a35101

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel