Monroe (MI) / IC2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 2.7 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-3bd3851f44cdf16ad7321d9d |
| Net Summer Capacity (MW) | 3 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-3bd3851f44cdf16ad7321d9d |
| Net Winter Capacity (MW) | 3 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-3bd3851f44cdf16ad7321d9d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5109 |
| Entity Name | DTE Electric Company |
| Plant ID | 1733 |
| Plant Name | Monroe (MI) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Monroe |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | IC2 |
| Nameplate Capacity (MW) | 2.7 |
| Net Summer Capacity (MW) | 3 |
| Net Winter Capacity (MW) | 3 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | IC |
| Operating Month | 12 |
| Operating Year | 1969 |
| Status | (OP) Operating |
| Latitude | 41.8906 |
| Longitude | -83.3464 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:2610 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2601
Sources EV-170da725af54cbf09a303cdeEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 055a4c9b1bb6473c06abcda699cc849c99d9c0c393610e27bf6716523b5cd817
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2610
Sources EV-3bd3851f44cdf16ad7321d9dEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 eb4a8334ac643df69dc1655798c89d0e8e42d9086c303ffbfcc623ec1c979763
Usage terms US government public domain
