United States of America · Generator · plant location

Hancock / 2

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
DTE Electric Company
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.5497, -83.4425

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Hancock / 2

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)19 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-007b24d96853192f3f91be86
Net Summer Capacity (MW)18 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-007b24d96853192f3f91be86
Net Winter Capacity (MW)24 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-007b24d96853192f3f91be86
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID1730
Plant NameHancock
Google MapMap
Bing MapMap
Plant StateMI
CountyOakland
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)19
Net Summer Capacity (MW)18
Net Winter Capacity (MW)24
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month10
Operating Year1967
Retirement Month12
Retirement Year2019
Latitude42.5497
Longitude-83.4425
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:1928

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1231

Sources EV-c485593128b6ce144de81c47
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 068f0a9254185eb7f37b76ffe224f22ee1d44d5d5efe6f38e61d1207872799b7

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:1928

Sources EV-007b24d96853192f3f91be86
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1fb41ed92fe17caf893950fa91763114d19e4c0f2071e27d68ee593cde2439ff

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel