Fermi / 3
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 16 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-7d3e045cd646935d1472bc24 |
| Net Summer Capacity (MW) | 13 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-7d3e045cd646935d1472bc24 |
| Net Winter Capacity (MW) | 19 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-7d3e045cd646935d1472bc24 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5109 |
| Entity Name | DTE Electric Company |
| Plant ID | 1729 |
| Plant Name | Fermi |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Monroe |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 16 |
| Net Summer Capacity (MW) | 13 |
| Net Winter Capacity (MW) | 19 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | GT |
| Operating Month | 4 |
| Operating Year | 1966 |
| Status | (OP) Operating |
| Latitude | 41.9631 |
| Longitude | -83.2581 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:2597 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2588
Sources EV-34cfa5b322f3146aaefe4532Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 580b183f10ccfbbccbdb21f67eb7d3ba0368bf911c644fa6da97184f61ae0143
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2597
Sources EV-7d3e045cd646935d1472bc24Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 60e867f3810d38b4009e6a70d06eb8c98c86155c8444865433da28d292815e4b
Usage terms US government public domain
