Apache Station / GT1
Generator · Standby
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 11.5 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-a9c12b23366ba5fd8cb4046e |
| Net Summer Capacity (MW) | 10 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-a9c12b23366ba5fd8cb4046e |
| Net Winter Capacity (MW) | 10 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-a9c12b23366ba5fd8cb4046e |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 796 |
| Entity Name | Arizona Electric Pwr Coop Inc |
| Plant ID | 160 |
| Plant Name | Apache Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Cochise |
| Balancing Authority Code | WALC |
| Sector | Electric Utility |
| Generator ID | GT1 |
| Nameplate Capacity (MW) | 11.5 |
| Net Summer Capacity (MW) | 10 |
| Net Winter Capacity (MW) | 10 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 2 |
| Operating Year | 1963 |
| Status | (SB) Standby/Backup: available for service but not normally used |
| Latitude | 32.0603 |
| Longitude | -109.8931 |
| Original text | (SB) Standby/Backup: available for service but not normally used |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:348 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:347
Sources EV-bd2deb0abfde055b41ffb9dcEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 637f9eba13bce8c4c1155d3258ba7fdf81d0f593b4b0e01e987857c61e70ac34
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:348
Sources EV-a9c12b23366ba5fd8cb4046eEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b11811f6126d4cb7662651adf6cebd7f256b7f446713ac6d7122acd824323cd1
Usage terms US government public domain
