United States of America · Generator · plant location

Weston Hydro / WE3

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Brookfield White Pine Hydro LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.763875, -69.71828

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Weston Hydro / WE3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-89de44aaebc139597dd1d49c
Net Summer Capacity (MW)3.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-89de44aaebc139597dd1d49c
Net Winter Capacity (MW)3.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-89de44aaebc139597dd1d49c
Detailed source fields
Original source fieldPublished value or condition
Entity ID39006
Entity NameBrookfield White Pine Hydro LLC
Plant ID1509
Plant NameWeston Hydro
Google MapMap
Bing MapMap
Plant StateME
CountySomerset
Balancing Authority CodeISNE
SectorIPP Non-CHP
Generator IDWE3
Nameplate Capacity (MW)3
Net Summer Capacity (MW)3.3
Net Winter Capacity (MW)3.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1921
Status(OP) Operating
Latitude44.763875
Longitude-69.71828
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:2422

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:2412

Sources EV-2d470b27a7e746d0553b92cb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1fcbef4befc4026a25974f56fb8e81e9261218303760b15bef396e8cf6b98187

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:2422

Sources EV-89de44aaebc139597dd1d49c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c9d3a4c442de029828d8904656f53eaad6422ea6c4e0a7a9a735f91bdf3eb4cd

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel