United States of America · Generator · plant location

Kyrene / KY7

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Salt River Project
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
33.3556, -111.9353

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Kyrene / KY7

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)192.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5eab8cc8bf4247ea3cf4aece
Net Summer Capacity (MW)160 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5eab8cc8bf4247ea3cf4aece
Net Winter Capacity (MW)176 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5eab8cc8bf4247ea3cf4aece
Detailed source fields
Original source fieldPublished value or condition
Entity ID16572
Entity NameSalt River Project
Plant ID147
Plant NameKyrene
Google MapMap
Bing MapMap
Plant StateAZ
CountyMaricopa
Balancing Authority CodeSRP
SectorElectric Utility
Generator IDKY7
Unit CodeKYS7
Nameplate Capacity (MW)192.7
Net Summer Capacity (MW)160
Net Winter Capacity (MW)176
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month10
Operating Year2002
Status(OP) Operating
Latitude33.3556
Longitude-111.9353
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:317

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:316

Sources EV-1151ccc446dcb8249338a60b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 24172a0d7416c40e69504b389c2852dd644435f42748e3a79e44343f68f9d1a8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:317

Sources EV-5eab8cc8bf4247ea3cf4aece
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b34015d675e515163b288a62232b7f39c74f1277b395afeaa09303fc731e5a2c

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel