United States of America · Generator · plant location

Agua Fria / AF4

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Salt River Project
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
33.5561, -112.2153

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Agua Fria / AF4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)80.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-09252fab3a027a80a4e3ec8b
Net Summer Capacity (MW)73 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-09252fab3a027a80a4e3ec8b
Net Winter Capacity (MW)87 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-09252fab3a027a80a4e3ec8b
Detailed source fields
Original source fieldPublished value or condition
Entity ID16572
Entity NameSalt River Project
Plant ID141
Plant NameAgua Fria
Google MapMap
Bing MapMap
Plant StateAZ
CountyMaricopa
Balancing Authority CodeSRP
SectorElectric Utility
Generator IDAF4
Nameplate Capacity (MW)80.5
Net Summer Capacity (MW)73
Net Winter Capacity (MW)87
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month5
Operating Year1975
Status(OP) Operating
Latitude33.5561
Longitude-112.2153
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:300

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:299

Sources EV-5c098bc6e9a5a0ae69a90586
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8d22c8539904d653ad8a856615a54c4f2550f09992bf5cf4d6a514221c9a1d83

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:300

Sources EV-09252fab3a027a80a4e3ec8b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cccf2ab68a5760a89effb04753f8d097c11bfe396f425b064ce8aa2215a84ccd

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel