Herington / 4B
Generator · Standby
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.6 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-3fce4a3dfe546578c5c4dabe |
| Net Summer Capacity (MW) | 1.5 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-3fce4a3dfe546578c5c4dabe |
| Net Winter Capacity (MW) | 1.5 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-3fce4a3dfe546578c5c4dabe |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 8490 |
| Entity Name | City of Herington - (KS) |
| Plant ID | 1283 |
| Plant Name | Herington |
| Google Map | Map |
| Bing Map | Map |
| Plant State | KS |
| County | Dickinson |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | 4B |
| Nameplate Capacity (MW) | 1.6 |
| Net Summer Capacity (MW) | 1.5 |
| Net Winter Capacity (MW) | 1.5 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | IC |
| Operating Month | 7 |
| Operating Year | 2001 |
| Status | (SB) Standby/Backup: available for service but not normally used |
| Latitude | 38.6658 |
| Longitude | -96.9492 |
| Original text | (SB) Standby/Backup: available for service but not normally used |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:2069 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:2064
Sources EV-3c182db3959fdbb3850b5233Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fb3a2ffbfa807e02bcbdd4ef504d5a26d063c3d0ef78c49a3410861fd273b3b9
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:2069
Sources EV-3fce4a3dfe546578c5c4dabeEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 59033c0074230ff61b2c8f50604e9f0fc976c1c612d027027433fa4de9775a41
Usage terms US government public domain
