United States of America · Generator · plant location

Summit Lake / GT2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Central Iowa Power Cooperative
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
41.1136, -94.3472

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Summit Lake / GT2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)35.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e6db2a5c38bec1b4829dc46c
Net Summer Capacity (MW)27.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e6db2a5c38bec1b4829dc46c
Net Winter Capacity (MW)32.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-e6db2a5c38bec1b4829dc46c
Detailed source fields
Original source fieldPublished value or condition
Entity ID3258
Entity NameCentral Iowa Power Cooperative
Plant ID1206
Plant NameSummit Lake
Google MapMap
Bing MapMap
Plant StateIA
CountyUnion
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDGT2
Nameplate Capacity (MW)35.3
Net Summer Capacity (MW)27.4
Net Winter Capacity (MW)32.8
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year1975
Status(OP) Operating
Latitude41.1136
Longitude-94.3472
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1954

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1947

Sources EV-76b9367bfa08e3d6250cc08f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cc1388f9a9b004879d7dd9876ca3a108fc0a56968cc4622462ed5c41df013ea9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1954

Sources EV-e6db2a5c38bec1b4829dc46c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 882f1932c0a4a29271c7596c464c2ce483cfffe724f9c5e3f677dd1ff7ef6f76

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel