United States of America · Generator · plant location

Yucca / GT4

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Arizona Public Service Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
32.7214, -114.7106

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Yucca / GT4

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)72.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-60585951ab762fe78e2f0bbe
Net Summer Capacity (MW)49.7 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-60585951ab762fe78e2f0bbe
Net Winter Capacity (MW)54 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-60585951ab762fe78e2f0bbe
Detailed source fields
Original source fieldPublished value or condition
Entity ID803
Entity NameArizona Public Service Co
Plant ID120
Plant NameYucca
Google MapMap
Bing MapMap
Plant StateAZ
CountyYuma
Balancing Authority CodeAZPS
SectorElectric Utility
Generator IDGT4
Nameplate Capacity (MW)72.4
Net Summer Capacity (MW)49.7
Net Winter Capacity (MW)54
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month7
Operating Year1974
Status(OP) Operating
Latitude32.7214
Longitude-114.7106
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:270

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:269

Sources EV-f166c20232846e26ef4e8d00
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8b4648f9c100eeae84c698f1f39254b317f6503e07e14ea7904bb3671c0ccb35

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:270

Sources EV-60585951ab762fe78e2f0bbe
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 96a0f22dae3e0902ae344a1c2973b7d21640ac404c8a9b5a119d63e5f9098017

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel