United States of America · Generator · plant location

Mt Pleasant / D

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
City of Mt Pleasant - (IA)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
40.971826, -91.55122

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Mt Pleasant / D

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3128bc8a6312f134e2ce6174
Net Summer Capacity (MW)1 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3128bc8a6312f134e2ce6174
Net Winter Capacity (MW)1 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-3128bc8a6312f134e2ce6174
Detailed source fields
Original source fieldPublished value or condition
Entity ID13038
Entity NameCity of Mt Pleasant - (IA)
Plant ID1166
Plant NameMt Pleasant
Google MapMap
Bing MapMap
Plant StateIA
CountyHenry
Balancing Authority CodeAECI
SectorElectric Utility
Generator IDD
Nameplate Capacity (MW)1
Net Summer Capacity (MW)1
Net Winter Capacity (MW)1
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeIC
Operating Month88
Operating Year1966
Retirement Month1
Retirement Year2002
Latitude40.971826
Longitude-91.55122
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:7276

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:879

Sources EV-ed4dac5820f91c62facb1fae
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5d79e9627c0f26e9d378ed44d9653c83f7be180db57088814226f07cb477805e

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:7276

Sources EV-3128bc8a6312f134e2ce6174
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0e567b276ff14a80fdad43cf57c7f4d91331b68e0295824f486c9e37b63c670c

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel