United States of America · Generator · plant location

Centerville / GT2

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Interstate Power and Light Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
40.7478, -92.87306

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Centerville / GT2

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)27 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-f64783d79178ab372f59e7cd
Net Summer Capacity (MW)26.3 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-f64783d79178ab372f59e7cd
Net Winter Capacity (MW)30.1 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-f64783d79178ab372f59e7cd
Detailed source fields
Original source fieldPublished value or condition
Entity ID9417
Entity NameInterstate Power and Light Co
Plant ID1105
Plant NameCenterville
Google MapMap
Bing MapMap
Plant StateIA
CountyAppanoose
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDGT2
Nameplate Capacity (MW)27
Net Summer Capacity (MW)26.3
Net Winter Capacity (MW)30.1
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month9
Operating Year1990
Retirement Month11
Retirement Year2017
Latitude40.7478
Longitude-92.87306
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:2739

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:827

Sources EV-11403abd636aca3f362f6c63
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2e50d5b3948552ead510083d1b1b9ecdea8889beebdd98fa3ed86fbffee8bac5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:2739

Sources EV-f64783d79178ab372f59e7cd
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ebccd48f6c905f335a9781a6b467b20fc1872df031f0056375684ded1b4b4439

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel