Lockport Powerhouse / 1GEN
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 8 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-2e0514302f686048b5e233dd |
| Net Summer Capacity (MW) | 6 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-2e0514302f686048b5e233dd |
| Net Winter Capacity (MW) | 6 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-2e0514302f686048b5e233dd |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3473 |
| Entity Name | Metro Wtr Recl Dist Grtr Chi |
| Plant ID | 10903 |
| Plant Name | Lockport Powerhouse |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IL |
| County | Will |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | 1GEN |
| Nameplate Capacity (MW) | 8 |
| Net Summer Capacity (MW) | 6 |
| Net Winter Capacity (MW) | 6 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 2 |
| Operating Year | 1999 |
| Status | (OA) Out of service but expected to return to service in next calendar year |
| Latitude | 41.5697 |
| Longitude | -88.0789 |
| Original text | (OA) Out of service but expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:8992 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:8990
Sources EV-94ca891de855af19c7ea786dEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cbc319f4ace7b28c162f793aa7dcec33e96cc466cc8843aafa9123981ae2b393
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:8992
Sources EV-2e0514302f686048b5e233ddEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 666806e9cfe0d9e37a6caa78815a7b859cf38cc5b36c44a34c83ddee0839ecb9
Usage terms US government public domain
