Australia · Generator · plant location

Barnawartha North Peaking Generation Facility

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Barnawartha North Peaking Generation Facility

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)2.05 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-97e958adf1c2fe972d1c95f1
Aggregated Nameplate Capacity (MW AC)8.2 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-97e958adf1c2fe972d1c95f1
Detailed source fields
Original source fieldPublished value or condition
Survey ID3162
Site NameBarnawartha North Peaking Generation Facility
Site OwnerBARNAWARTHA NORTH ENERGY PTY LTD
RegionVIC1
Max Site Capacity (AC)7.8
Gen Info Unit ID316201
Unit NameBWA01
Technology TypeOther
Technology DetailOther
Dispatch TypeNon-scheduled
Unit Count4
Unit Capacity (MW AC)2.05
Aggregated Nameplate Capacity (MW AC)8.2
Commitment StatusPublicly Announced
Full Commercial Use Date2027-09-30T00:00:00
Expected Closure Year2052
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-18T15:53:57
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:64

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:64

Sources EV-97e958adf1c2fe972d1c95f1
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 69f1933453942ef53b9c2bdd2efda8a8783564e0adac9618e2d2e4ea8f344991

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel