Australia · Generator · plant location

Beebo Solar Farm - KCI

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Beebo Solar Farm - KCI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)4.4 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-935916ca568bf112edde7f62
Aggregated Nameplate Capacity (MW AC)528 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-935916ca568bf112edde7f62
Detailed source fields
Original source fieldPublished value or condition
Survey ID2726
Site NameBeebo Solar Farm - KCI
KCI IdQ00148
Site OwnerBEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST
RegionQLD1
Max Site Capacity (AC)400
Gen Info Unit ID272601
Unit NameBBSF_GU1
Technology TypeSolar PV
Technology DetailFixed
Dispatch TypeSemi-scheduled
Unit Count120
Unit Capacity (MW AC)4.4
Aggregated Nameplate Capacity (MW AC)528
Commitment StatusPublicly Announced
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2025-06-22T07:04:20
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:83

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:83

Sources EV-935916ca568bf112edde7f62
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 d4993af04fe8ca493eca811bb190249e38c4be22474ef3e3066a940e9f75eb73

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel