Australia · Generator · plant location

Bashan 1 Wind Farm

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bashan 1 Wind Farm

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)7.8 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-fcad0bde31124d4bd7deb885
Unit Capacity (MW AC)7.8 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-fcad0bde31124d4bd7deb885
Aggregated Nameplate Capacity (MW DC)460.2 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-fcad0bde31124d4bd7deb885
Aggregated Nameplate Capacity (MW AC)460.2 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-fcad0bde31124d4bd7deb885
Detailed source fields
Original source fieldPublished value or condition
Survey ID2470
Site NameBashan 1 Wind Farm
KCI IdT00028
Site OwnerGoldwind Australia
RegionTAS1
Max Site Capacity (AC)460
Gen Info Unit ID247001
Unit NameB1WF_GU1
Technology TypeWind
Technology DetailOnshore
Dispatch TypeSemi-scheduled
Unit Count59
Unit Capacity (MW DC)7.8
Unit Capacity (MW AC)7.8
Aggregated Nameplate Capacity (MW DC)460.2
Aggregated Nameplate Capacity (MW AC)460.2
Commitment StatusPublicly Announced
Full Commercial Use Date2030-07-01T00:00:00
Expected Closure Year2060
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-27T15:57:28
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:72

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:72

Sources EV-fcad0bde31124d4bd7deb885
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 6e6ff22b8e242d29542f82675584b1b9712086b82420f604efff9115a9b9872c

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel