Australia · Generator · plant location

Blackwater Hybrid System

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Blackwater Hybrid System

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)3 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-d19de90fd3ac73a28bfe9ddb
Unit Capacity (MW AC)2.94 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-d19de90fd3ac73a28bfe9ddb
Aggregated Nameplate Capacity (MW DC)204 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-d19de90fd3ac73a28bfe9ddb
Aggregated Nameplate Capacity (MW AC)199.92 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-d19de90fd3ac73a28bfe9ddb
Agg Nameplate Storage Capacity (MWh)399.84 MWhOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-d19de90fd3ac73a28bfe9ddb
Detailed source fields
Original source fieldPublished value or condition
Survey ID2432
Site NameBlackwater Hybrid System
KCI IdQ00048
Site OwnerBlackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust
RegionQLD1
Max Site Capacity (AC)270
Gen Info Unit ID243201
Unit NameBHS_BESS
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count68
Unit Capacity (MW DC)3
Unit Capacity (MW AC)2.94
Aggregated Nameplate Capacity (MW DC)204
Aggregated Nameplate Capacity (MW AC)199.92
Agg Nameplate Storage Capacity (MWh)399.84
Commitment StatusPublicly Announced
Full Commercial Use Date2030-10-06T00:00:00
Expected Closure Year2062
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-21T14:37:25
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:118

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:118

Sources EV-d19de90fd3ac73a28bfe9ddb
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 a4c5348e99a93e159869467d5603b688e0098582d7ec868ae6176f86b6f5716f

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel