Australia · Generator · plant location

Mortlake Energy Hub

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Mortlake Energy Hub

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)4.39 MWdcOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-bb3a64c7cc83e7a1672228cc
Unit Capacity (MW AC)4.39 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-bb3a64c7cc83e7a1672228cc
Aggregated Nameplate Capacity (MW DC)316.08 MWdcOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-bb3a64c7cc83e7a1672228cc
Aggregated Nameplate Capacity (MW AC)316.08 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-bb3a64c7cc83e7a1672228cc
Agg Nameplate Storage Capacity (MWh)1440 MWhOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-bb3a64c7cc83e7a1672228cc
Detailed source fields
Original source fieldPublished value or condition
Survey ID2022
Site NameMortlake Energy Hub
KCI IdV00077
Site OwnerYanara Australia Pty Ltd
RegionVIC1
Max Site Capacity (AC)300
Gen Info Unit ID202201
Unit Name1
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count72
Unit Capacity (MW DC)4.39
Unit Capacity (MW AC)4.39
Aggregated Nameplate Capacity (MW DC)316.08
Aggregated Nameplate Capacity (MW AC)316.08
Agg Nameplate Storage Capacity (MWh)1440
Commitment StatusAnticipated
Full Commercial Use Date2028-08-30T00:00:00
Expected Closure Year2068
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-26T15:44:50
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textAnticipated
source_record_idGenerator Information:1014

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1014

Sources EV-bb3a64c7cc83e7a1672228cc
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 3a1e96610caa8a399811643f68ac7091a03688c1268e4c8167215441a04611bc

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:467

Sources EV-08f5cf06361b4bec6c8db258
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 5b2678781b7fc1b861bd838ed7670abd8a517cc8c62268e0c977c564d157c312

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel