Australia · Generator · plant location

Bennetts Creek BESS

공식 원천의 전력 객체 · Committed development plan

Project stage · source basis
Stage requires verification · committed
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bennetts Creek BESS

Generator · Committed development plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)4.2 MWdcOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-a2cd528740a828dcc436e3d6
Unit Capacity (MW AC)4.2 MWacOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-a2cd528740a828dcc436e3d6
Aggregated Nameplate Capacity (MW DC)176.4 MWdcOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-a2cd528740a828dcc436e3d6
Aggregated Nameplate Capacity (MW AC)176.4 MWacOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-a2cd528740a828dcc436e3d6
Agg Nameplate Storage Capacity (MWh)223.02 MWhOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-a2cd528740a828dcc436e3d6
Detailed source fields
Original source fieldPublished value or condition
Survey ID1956
Site NameBennetts Creek BESS
KCI IdV00045
Site OwnerBennetts Creek Energy Project Pty Ltd in its capacity as Trustee for the Bennetts Creek Energy Project Trust
RegionVIC1
Max Site Capacity (AC)100
Gen Info Unit ID195601
Unit NameBCBESS
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count42
Unit Capacity (MW DC)4.2
Unit Capacity (MW AC)4.2
Aggregated Nameplate Capacity (MW DC)176.4
Aggregated Nameplate Capacity (MW AC)176.4
Agg Nameplate Storage Capacity (MWh)223.02
Commitment StatusCommitted
Full Commercial Use Date2028-03-30T00:00:00
Expected Closure Year2048
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-06-01T09:43:12
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted
source_record_idGenerator Information:101

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:101

Sources EV-a2cd528740a828dcc436e3d6
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 f4c194f6ce6d87989f30b9377ffb468b06346c433874d5e213571bfa183b36b1

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:44

Sources EV-7be92bae1a12f7795cf212f4
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 1e6d5c1067bc851243c4b90c37134190f21ad9aeb15d985bda25d6d4e06754c6

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel