Australia · Generator · plant location

Mortlake Battery

공식 원천의 전력 객체 · commissioning

Project stage · source basis
Stage requires verification · commissioning
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Mortlake Battery

Generator · commissioning

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)300 MWdcOriginal source column definition · Generation-register unit · In Commissioning
As-of date 2026-07-31
Sources EV-49cb1ba122066c80a7643086
Unit Capacity (MW AC)300 MWacOriginal source column definition · Generation-register unit · In Commissioning
As-of date 2026-07-31
Sources EV-49cb1ba122066c80a7643086
Aggregated Nameplate Capacity (MW DC)300 MWdcOriginal source column definition · Generation-register unit · In Commissioning
As-of date 2026-07-31
Sources EV-49cb1ba122066c80a7643086
Aggregated Nameplate Capacity (MW AC)300 MWacOriginal source column definition · Generation-register unit · In Commissioning
As-of date 2026-07-31
Sources EV-49cb1ba122066c80a7643086
Agg Nameplate Storage Capacity (MWh)650 MWhOriginal source column definition · Generation-register unit · In Commissioning
As-of date 2026-07-31
Sources EV-49cb1ba122066c80a7643086
Detailed source fields
Original source fieldPublished value or condition
Survey ID1882
Site NameMortlake Battery
KCI IdV00018
Site OwnerBORAL
RegionVIC1
Max Site Capacity (AC)300
Gen Info Unit ID188201
Unit NameMRTLKBT
Technology TypeBattery Storage
Technology DetailLithium-ion
DUIDMLB01
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW DC)300
Unit Capacity (MW AC)300
Aggregated Nameplate Capacity (MW DC)300
Aggregated Nameplate Capacity (MW AC)300
Agg Nameplate Storage Capacity (MWh)650
Commitment StatusIn Commissioning
Full Commercial Use Date2026-07-31T00:00:00
Expected Closure Year2056
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-06-11T15:06:27
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Commissioning
source_record_idGenerator Information:1012

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1012

Sources EV-49cb1ba122066c80a7643086
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 bc0b27ec9ffd31b2dee588ddc8cb04f0e1cc44adfe21ef83874c9b27befd8e94

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:466

Sources EV-11f3db58c9daabd0d10803e0
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 57b6cf5d9eb3e13220e1867225fe54d846b918f17a5901a9f95d9940b5a63313

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel