Australia · Generator · plant location

Ardandra Solar Farm And BESS

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Ardandra Solar Farm And BESS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)4.15 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-036d6909221c47cf4b3bec65
Unit Capacity (MW AC)3.46 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-036d6909221c47cf4b3bec65
Aggregated Nameplate Capacity (MW DC)116.2 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-036d6909221c47cf4b3bec65
Aggregated Nameplate Capacity (MW AC)96.88 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-036d6909221c47cf4b3bec65
Detailed source fields
Original source fieldPublished value or condition
Survey ID1855
Site NameArdandra Solar Farm And BESS
Site OwnerArdandra SF Pty Ltd as trustee for Ardandra SF Trust
RegionQLD1
Max Site Capacity (AC)97
Gen Info Unit ID185502
Unit NameArdSF1
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
Dispatch TypeSemi-scheduled
Unit Count28
Unit Capacity (MW DC)4.15
Unit Capacity (MW AC)3.46
Aggregated Nameplate Capacity (MW DC)116.2
Aggregated Nameplate Capacity (MW AC)96.88
Commitment StatusPublicly Announced
Full Commercial Use Date2029-05-18T00:00:00
Expected Closure Year2059
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-22T10:47:04
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:24

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:24

Sources EV-036d6909221c47cf4b3bec65
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 32c0fb3cb5e8ab240a2ae4e8a8b890deafd9af6df377da8151774e85d6286425

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel