Australia · Generator · plant location

Snowy 2.0.

공식 원천의 전력 객체 · Committed development plan

Project stage · source basis
Stage requires verification · committed
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Snowy 2.0.

Generator · Committed development plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)363 MWacOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-9fbb1ef27f94d2eabb4cfaa3
Aggregated Nameplate Capacity (MW AC)363 MWacOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-9fbb1ef27f94d2eabb4cfaa3
Agg Nameplate Storage Capacity (MWh)58330 MWhOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-9fbb1ef27f94d2eabb4cfaa3
Detailed source fields
Original source fieldPublished value or condition
Survey ID1752
Site NameSnowy 2.0.
Site OwnerSnowy Hydro Ltd
RegionNSW1
Max Site Capacity (AC)2200
Gen Info Unit ID175201
Unit NameSNO2PH01
Technology TypeHydro
Technology DetailPumped Hydro
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)363
Aggregated Nameplate Capacity (MW AC)363
Agg Nameplate Storage Capacity (MWh)58330
Commitment StatusCommitted
Full Commercial Use Date2028-12-31T00:00:00
Expected Closure Year2129
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-06-11T11:38:24
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted
source_record_idGenerator Information:1336

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1336

Sources EV-9fbb1ef27f94d2eabb4cfaa3
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 a8ad7313effe1f32ad2fc89bc63c1bc75c2f06d00cbc00016b8b5f0ba44adcfb

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:617

Sources EV-8a8db3307d95e2d04f975a27
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 72330024bd1f8e572aebd8e69bfdab958017fed2894459b7aeac3c517296f098

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel