Australia · Generator · plant location

Bolivar Power Station

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bolivar Power Station

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)32.1 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-2365bfe8c0d1627c7336ebb3
Aggregated Nameplate Capacity (MW AC)32.1 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-2365bfe8c0d1627c7336ebb3
Detailed source fields
Original source fieldPublished value or condition
Survey ID1533
Site NameBolivar Power Station
Site OwnerIberdrola Australia Energy Markets Pty Limited
RegionSA1
Max Site Capacity (AC)127
Gen Info Unit ID153305
Unit NameBOLINF4
Technology TypeGas Turbine
Technology DetailOCGT
Gas Turbine Fuel TypeNatural Gas
DUIDBOLIVPS1
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)32.1
Aggregated Nameplate Capacity (MW AC)32.1
Commitment StatusIn Service
Expected Closure Year2045
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-19T10:23:38
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:150

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:150

Sources EV-2365bfe8c0d1627c7336ebb3
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 c805aad51d47dc81aa53843df044c2364e39876c8fdbe4a3ed1972c8c969afa6

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:71

Sources EV-12069c7b7a39167967299610
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 7727ba2e1bb7e76e92dbae02e60b319798d437fe00a7155b896e4efe9740585a

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel