Australia · Generator · plant location

Bolivar Power Station

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bolivar Power Station

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)32.1 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-4c47f12382a4824097ed6e6f
Aggregated Nameplate Capacity (MW AC)32.1 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-4c47f12382a4824097ed6e6f
Detailed source fields
Original source fieldPublished value or condition
Survey ID1533
Site NameBolivar Power Station
Site OwnerIberdrola Australia Energy Markets Pty Limited
RegionSA1
Max Site Capacity (AC)127
Gen Info Unit ID153303
Unit NameBOLINF2
Technology TypeGas Turbine
Technology DetailOCGT
Gas Turbine Fuel TypeNatural Gas
DUIDBOLIVPS1
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)32.1
Aggregated Nameplate Capacity (MW AC)32.1
Commitment StatusIn Service
Expected Closure Year2045
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-19T10:23:38
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:148

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:148

Sources EV-4c47f12382a4824097ed6e6f
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:69

Sources EV-5f8f78e0ec0054be5739e02d
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 b44a76a96c7d37c96179d6e1cbc4fd7dac61dce80d5d9b1a6b14d37f6d2ad4f3

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel