POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Bolivar Power Station Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 32.1 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f Aggregated Nameplate Capacity (MW AC) 32.1 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f
Detailed source fields Original source field Published value or condition Survey ID 1533 Site Name Bolivar Power Station Site Owner Iberdrola Australia Energy Markets Pty Limited Region SA1 Max Site Capacity (AC) 127 Gen Info Unit ID 153303 Unit Name BOLINF2 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BOLIVPS1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 32.1 Aggregated Nameplate Capacity (MW AC) 32.1 Commitment Status In Service Expected Closure Year 2045 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-05-19T10:23:38 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:148
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:69
Sources EV-5f8f78e0ec0054be5739e02d Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 b44a76a96c7d37c96179d6e1cbc4fd7dac61dce80d5d9b1a6b14d37f6d2ad4f3 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1533 Site Name Bolivar Power Station Site Owner Iberdrola Australia Energy Markets Pty Limited Region SA1 Max Site Capacity (AC) 127 Gen Info Unit ID 153303 Unit Name BOLINF2 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BOLIVPS1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 32.1 Aggregated Nameplate Capacity (MW AC) 32.1 Commitment Status In Service Expected Closure Year 2045 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-05-19T10:23:38 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:148
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region SA1 AEMO Survey ID 1533 Gen Info Unit ID 153303 Site Name Bolivar Power Station DUID BOLIVPS1 Commitment Status In Service Expected Closure Year 2045 Survey Latest Update Date 2026-05-19T10:23:38 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:69
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:69
Sources EV-5f8f78e0ec0054be5739e02d Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 b44a76a96c7d37c96179d6e1cbc4fd7dac61dce80d5d9b1a6b14d37f6d2ad4f3 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 24.8 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 31.4 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 27.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-4c47f12382a4824097ed6e6f 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:148
Sources EV-4c47f12382a4824097ed6e6f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 61a322d54638d508031c8bf4d07eba386213e2b1d94c87cb92502ab6b6602522 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset