Bannerton Solar Park
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW DC) | 2.75 MWdc | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-e760c2e4ce25340a8062d31d |
| Unit Capacity (MW AC) | 2.5 MWac | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-e760c2e4ce25340a8062d31d |
| Aggregated Nameplate Capacity (MW DC) | 110 MWdc | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-e760c2e4ce25340a8062d31d |
| Aggregated Nameplate Capacity (MW AC) | 100 MWac | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-e760c2e4ce25340a8062d31d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 1492 |
| Site Name | Bannerton Solar Park |
| Site Owner | Foresight Solar Australia Pty Ltd |
| Region | VIC1 |
| Max Site Capacity (AC) | 100 |
| Gen Info Unit ID | 149201 |
| Unit Name | Bannerton Solar Park |
| Technology Type | Solar PV |
| Technology Detail | Single Axis Tracking |
| DUID | BANN1 |
| Dispatch Type | Semi-scheduled |
| Unit Count | 40 |
| Unit Capacity (MW DC) | 2.75 |
| Unit Capacity (MW AC) | 2.5 |
| Aggregated Nameplate Capacity (MW DC) | 110 |
| Aggregated Nameplate Capacity (MW AC) | 100 |
| Commitment Status | In Service |
| Expected Closure Year | 2049 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-16T12:38:46 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | In Service |
| source_record_id | Generator Information:56 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:56
Sources EV-e760c2e4ce25340a8062d31dEvidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 7d80843cb69d3b7ee982fc0a31ef68bc469057050ba5b48a9c56b7bc940884db
Usage terms AEMO general copyright permission subject to exceptions
Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:28
Sources EV-838fc394a175b378fa18fe89Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 ed8a7088c75647f6336318297cc0ed6e311f6e5bb000d26fd36ae1ec8751cc4a
Usage terms AEMO general copyright permission subject to exceptions
