Australia · Generator · plant location

Broken Hill Solar Plant

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Broken Hill Solar Plant

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)1.33 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-1f30780a47c0d505303858ca
Aggregated Nameplate Capacity (MW AC)53.2 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-1f30780a47c0d505303858ca
Detailed source fields
Original source fieldPublished value or condition
Survey ID1266
Site NameBroken Hill Solar Plant
Site OwnerPARF Company 6 Pty Limited
RegionNSW1
Max Site Capacity (AC)53
Gen Info Unit ID126601
Unit NameBroken Hill Solar Plant:Units 1-40
Technology TypeSolar PV
Technology DetailFixed
DUIDBROKENH1
Dispatch TypeSemi-scheduled
Unit Count40
Unit Capacity (MW AC)1.33
Aggregated Nameplate Capacity (MW AC)53.2
Commitment StatusIn Service
Expected Closure Year2043
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2025-03-20T23:23:09
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:200

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:200

Sources EV-1f30780a47c0d505303858ca
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 ee678d38ffb00de9fd45a218421a200dbea19254c5331fee91cf351a2e65fdb8

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:92

Sources EV-7b665a2261223fb31125893d
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 7a3d57d89e9466d88f348b200ce14347ab1b8fe2fa9118d5c36f5e8219ec71e7

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel