Australia · Generator · plant location

Tungatinah

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Tungatinah

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)25 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-cd4f44cc647e738ddc8f535e
Aggregated Nameplate Capacity (MW AC)25 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-cd4f44cc647e738ddc8f535e
Detailed source fields
Original source fieldPublished value or condition
Survey ID1216
Site NameTungatinah
Site OwnerHydro-Electric Corporation
RegionTAS1
Max Site Capacity (AC)142
Gen Info Unit ID121604
Unit NameTungatinah:4
Technology TypeHydro
Technology DetailDam
DUIDTUNGATIN
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)25
Aggregated Nameplate Capacity (MW AC)25
Commitment StatusIn Service
Expected Closure Year2100
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-23T12:53:03
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:1551

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1551

Sources EV-cd4f44cc647e738ddc8f535e
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b6c6ca3eae21c4f210ba366c7cf02feff1e8b69188197afb613da41d8c0df93c

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:727

Sources EV-92f917661b1cabcb44633eea
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 e39641c17f1497d22e517127f0a3c95b8086b7276d0d3c88ab92ca1ed9ccaea4

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel