Mt Gellibrand Wind Farm
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW DC) | 3.15 MWdc | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-bdd274500120a0e75bdbe204 |
| Unit Capacity (MW AC) | 3.15 MWac | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-bdd274500120a0e75bdbe204 |
| Aggregated Nameplate Capacity (MW DC) | 9.45 MWdc | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-bdd274500120a0e75bdbe204 |
| Aggregated Nameplate Capacity (MW AC) | 9.45 MWac | Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-bdd274500120a0e75bdbe204 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 1141 |
| Site Name | Mt Gellibrand Wind Farm |
| Site Owner | ACCIONA Energy |
| Region | VIC1 |
| Max Site Capacity (AC) | 132 |
| Gen Info Unit ID | 114105 |
| Unit Name | MGW23 |
| Technology Type | Wind |
| Technology Detail | Onshore |
| DUID | MTGELWF1 |
| Dispatch Type | Semi-scheduled |
| Unit Count | 3 |
| Unit Capacity (MW DC) | 3.15 |
| Unit Capacity (MW AC) | 3.15 |
| Aggregated Nameplate Capacity (MW DC) | 9.45 |
| Aggregated Nameplate Capacity (MW AC) | 9.45 |
| Commitment Status | In Service |
| Expected Closure Year | 2043 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-12T16:38:28 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | In Service |
| source_record_id | Generator Information:1042 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1042
Sources EV-bdd274500120a0e75bdbe204Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 6661f4a3d07a4a5afaaca37b9d23f9a0eddc6013e4092daa4f78a20d7d14499c
Usage terms AEMO general copyright permission subject to exceptions
Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:477
Sources EV-dc914e2b8fe6ba8b1fbba2b4Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 60a34c8d18624b1de5e9969f0b26fadff7083f4b7190ad01a4b861bc6572529d
Usage terms AEMO general copyright permission subject to exceptions