Mortlake
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW AC) | 50 MWac | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-0c11d20cf289a0e0e22437d4 |
| Aggregated Nameplate Capacity (MW AC) | 50 MWac | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-0c11d20cf289a0e0e22437d4 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 1139 |
| Site Name | Mortlake |
| Site Owner | Origin Energy Power Limited |
| Region | VIC1 |
| Max Site Capacity (AC) | 584 |
| Gen Info Unit ID | 113902 |
| Unit Name | MortEx22 |
| Technology Type | Gas Turbine |
| Technology Detail | OCGT |
| Gas Turbine Fuel Type | Natural Gas |
| Dispatch Type | Scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 50 |
| Aggregated Nameplate Capacity (MW AC) | 50 |
| Commitment Status | Publicly Announced |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-30T10:51:52 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | Publicly Announced |
| source_record_id | Generator Information:1007 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:1007
Sources EV-0c11d20cf289a0e0e22437d4Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 cd8eaa43029cf7eff297a74f886b1342b5e90b2299692ff6e416e33f9bc4d1d7
Usage terms AEMO general copyright permission subject to exceptions
