Australia · Generator · plant location

Gladstone

공식 원천의 전력 객체 · withdrawal announced

Project stage · source basis
Stage requires verification · withdrawal_announced
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Gladstone

Generator · withdrawal announced

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)280 MWacOriginal source column definition · Generation-register unit · Announced Withdrawal
As-of date 2026-07-31
Sources EV-a4e194cdef4ccaf8c4347ce5
Aggregated Nameplate Capacity (MW AC)280 MWacOriginal source column definition · Generation-register unit · Announced Withdrawal
As-of date 2026-07-31
Sources EV-a4e194cdef4ccaf8c4347ce5
Detailed source fields
Original source fieldPublished value or condition
Survey ID1077
Site NameGladstone
Site OwnerGladstone Power Station Participants
RegionQLD1
Max Site Capacity (AC)1680
Gen Info Unit ID107706
Unit NameGladstone:6
Technology TypeCoal
Technology DetailBlack Coal
DUIDGSTONE6
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)280
Aggregated Nameplate Capacity (MW AC)280
Commitment StatusAnnounced Withdrawal
Expected Closure Year2029
Closure Date2029-03-31T00:00:00
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-06T15:01:43
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textAnnounced Withdrawal
source_record_idGenerator Information:545

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:545

Sources EV-a4e194cdef4ccaf8c4347ce5
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 6159fdb61ac47de31f16efb014b083ce533457ff8af8ddf0272820daf4687f41

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:252

Sources EV-24b1b38ce53c59b70b91b462
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 a376a66d1e8fcd02dc5c879dcc6dee9a34c0af75f5a32e34a0677ff6a60d31e6

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel